Assignment
Name:
Northern Negros Geothermal Power Plant Project (49
MW )
|
|
Country:
Philippines
|
|
Client:
Philippine
National Oil Company - Energy Development Corporation (PNOC-EDC)
|
|
Financial
Source: Japan
Bank of International Cooperation (JBIC)
|
|
Service
Period:
January
2001 - February 2007, O&M Advisory :
March 2007-July 2010
|
|
Narrative
Description of Project:
PNOC-EDC planned to develop a geothermal power plant
with aggregated capacity of 40 MW and associated switchyards and
transmission lines. Proving the development of the geothermal resources
as a feasible project, PNOC-EDC acquired a loan package with the
Japan Bank for International Cooperation (JBIC) for construction
of fluid collection and recycle system (FCRS), power plant(s), and
associated switchyards and transmission lines.
|
Services
:
- Market study
and power plant configuration study
- Review of
Feasibility Study on Geothermal Resource
- Review of
PNOC-EDCfs conceptual design for FCRS
- Preparation
of tender documents
- Assistance
in bidding and contracting
- Assistance
in contract negotiation
- Check and
review of manufacturesf design and drawings
- Assistance
in the inspection and witness to shop tests
- Construction
supervision
- Assistance
in commissioning
- Assistance
in operation and maintenance (Advisory capacity)
 |
 |
| Northern
Negros Geothermal Power Plant (49 MW) |
|