Project
Name:
Rehabilitation Project of Malaya Oil-fired Thermal Power Plant
|
|
Country:
Philippine
|
|
Financial
source: Export-Import Bank
of Japan (EXIM-J)
|
|
Client:
National Power Corporation (NPC)
|
|
Service
Period: September 1985 to October 1987
|
|
1.
PROJECT DESCRIPTION
WEST
JEC carried out survey for preparation of the master plan for rehabilitation
of thermal power plants in Metro Manila under grant by JICA. With
financial assistance of EXIM-J, the rehabilitation project of Malaya
Thermal Power Plant was implemented.
2. SERVICES
provided by WEST JEC
- Preparation
of the master plan for the rehabilitation projects (sponsored
by JICA)
- Site survey
and inspection of plant facilities
- Preparation
of a feasibility study report and Implementation Program (IP)
- Preparation
of tender documents
- Assistance
in bidding and contracting
- Check and
review of manufacturersf design and drawings
- Construction
supervision
- Assistance
in the inspection and witness to shop tests
- Assistance
in commissioning
- Training in
power plant design at the consultant7's home office and in construction
supervision on OJT basis.
3.
MAIN TECHNICAL FEATURES
| @ |
Unit
1 |
Unit
2 |
| @Capacity
(gross) [MW] |
300 |
350 |
| @Fuel |
Heavy
oil |
| @Originally
Commissioned |
1975 |
1979 |
| @Boiler |
| @Manufacturer |
Babcock-Hitach |
| @Type |
Single
drum,indoor |
| @Steam
Flow [MCR t/h] |
1034 |
1305 |
| @Steam
Temp. [° C] |
541
/ 541 |
| @Steam
Pressure [MPa] |
19.2
/ 3.85 |
17.04
/ 3.2 |
| @Turbine |
| @Manufacturer |
KWU |
Hitachi |
| @Type |
Tandem-compound,
reheat, condensing |
| @Generator |
| @Manufacturer |
Siemens |
Hitachi |
| @Capacity
[MVA] |
370 |
438 |
| @Voltage
[kV] |
21 |
| @Frequency
[Hz] |
60 |
| @Power
factor |
0.9 |
0.9 |
|