Project
Name:
Can Tho Oil-fired Thermal Power Plant Construction Project
|
|
Country:
Vietnam
|
|
Client:
Vietnam Power Company (VPC)
|
|
Financial source:
The Overseas Economic Fund Cooperation, Japan (OECF)
|
|
Service
Period: December 1971 to March 1975
|
|
1.
PROJECT DESCRIPTION
Aiming
at improving of living and promotion of industrial development in
the Mekong Delta, a construction project for a power plant in Can
Tho, the central city of the delta, and accompanying transmission
lines was planned. From November 1970 to March 1971, WEST JEC conducted
a feasibility study sponsored by OTCA (JICAfs antecedents).
Obtaining
a loan from Overseas Economic Cooperation Fund (OECF) of Japan,
VPC started the construction project of Can Tho Oil-fired Thermal
Power Plant, related transmission lines, five substations and communication
system. WEST JEC provided engineering services for the project.
2.
SERVICES provided by WEST JEC
- Feasibility
Study
- Engineering
Services and Construction Supervision
- Training for
the client's personnel
3.
MAIN TECHNICAL FEATURES
(1) Power Plant
| @Capacity |
@33
MW x 1 (Gross) |
| @Fuel |
@Heavy
oil |
|
@Boiler
|
| @Manufacturer |
@HITACHI,
LTD., Jpapan |
| @Type |
@Natural
circulating, drum, outdoor type |
| @Steam
condition |
@157.5
t/h, 480 ° C, 6 Mpa |
| @Turbine |
| @Manufacturer |
@HITACHI,
LTD., Jpapan |
| @Type |
@Impulse,
single casing, condensing
|
| @Generator |
| @Manufacturer |
@HITACHI,
LTD., Jpapan |
| @Type |
@Horizontal
shaft, revolving field, totally enclosed, air cooled |
| @Capacity |
@40,825
kVA |
| @Main
Transformer |
| @Manufacturer |
@HITACHI,
LTD., Jpapan |
| @Capacity |
38,000
kVA
|
(2) Transmission
Lines and Substations
| @Transmission
Lines |
66
kV x 190 km including Bassac River crossing section of 1000
m span of 220 kV |
| @Substations |
Can
Tho 10
MVA x 2 |
|
@Sa Dec
|
6
MVA x 1 |
| @Vinh
Long |
6
MVA x 1 |
| @Long
Xuyen |
10
MVA x 1 |
| @Ra
Gia |
6
MVA x 1 |
|
@
|